Dashixia Water Control Project in Xinjiang: Construction Rush Ahead
Time : 2025-08-16
Dashixia Water Control Project in Xinjiang: Construction Rush Ahead

16th August 2025, The construction of the Dashixia Water Conservancy Hub Project in Wushu County, Aksoo Prefecture, Xinjiang Uygur Autonomous Region, is currently in the final stage. It is expected that in September, after the completion of the third phase of the concrete pouring, the sluice gate will be opened for water storage.


The DashiXia Hydropower Reservoir Project is one of the 172 major water conservation and water supply projects determined by the State Council. The project is scheduled to be completed in 2026. At that time, it will provide ecological water supply to the main stream of the Tarim River annually and effectively enhance the capabilities of irrigation, flood control, and drought resistance in farmlands. Horizon Technology Group has provided strong support for the project construction. The company's water engineering machinery products have stable and reliable quality, providing a solid guarantee for the project to be completed and put into production on time.

Previous page:Already the first
Next page:Already the last